How to install CircoBoard | Circoflo | Underfloor Heating Your Way

How to install CircoBoard


1
Before Getting Started
Make sure you check the warnings on the panel before you start installing.

Make sure pipe channels are free of debris, and that when it is installed, the CircoBoard panels are flush with the top of the joists or battens to ensure they will be hard up against the underside of the floor deck when it’s laid


2
Attaching the Manifold
Attach the manifold to the wall as shown, using appropriate wall mounting fittings.

You can arrange the flow and return pipework in a variety of ways, depending on what is best for your installation. The two manifold blocks should be within 500mm of each other to allow for the actuators (with 1500mm of cable) to be connected into the 4-zone wiring centre positioned close by.


3
Fix the support brackets or battens and lay the panels
Fix support battens 25mm below the top of the joists or L brackets (supplied in the Circoflo range) to the sides of the joists with the top of the bracket flush with the top of the joist.

This ensures the CircoBoard panels are in tight contact with the underside of the floor deck when installed. Alternatively use wooden battens fixed onto the joist.

Lay the panels in a run in front of one another between the joists.

Cut the panels along their length where necessary to fit between joists or battens. Cut the final panel in a run to fit and use to start the next run. Make sure the pipe channels on the offcut line up with the neighbouring panel.


4
Lay the Pipe
Starting at the manifold and working from the edge of the room, push the pipe into the pre-perforated foil channels in a serpentine pattern.

Cut notches in the joist or battens where the pipe passes between inter joist/ batten spaces for the pipe to sit in. Ensure that there is enough pipe exposed from the floor to reach the ports on the manifold. Don’t lay any pipe in areas which will be unheated (such as underneath kitchen units). Lay walking boards to provide stability when installing the pipe into the CircoBoard inter joist panels. The panels are not strong enough to walk on.

Additional channels for the flows and returns may be required where the pipes approach the manifold. To create extra channels, use a blade knife to score and peel back the foil where the channels will be located. Next use a Circoflo hot blade cutter to create the new channel.


5
COMPLETING THE CIRCUIT INSTALLATION
When returning the circuit to the manifold, cut the pipe with a pipe cutter ensuring that the pipe is long enough to reach the manifold. Label the pipe with flow and return and number the circuit. This will help when connecting to the manifold.

Note: Once the panels and pipe have been laid, they should be protected with walking boards especially in areas with high levels of foot traffic such as doorways.


6
Connect the Manifold
Connect the 22mm primary pipework from the heat source.

If you require a mixing unit this will need to be installed in the primary heating pipework along with a standard pump typically located beside the boiler/ heat source.

Fit the monoblocco connectors on to the ends of the pipe and screw onto the manifold by hand. Using a spanner, tighten the connection whilst maintaining upwards pressure on the pipe.

Note: Once connected, it is recommended to insulate all primary pipe work.

Before continuing, complete the connection checklist below:

    • All manifold joints are tight and sealed
    • Primary flow and return are connected to the manifold correctly
    • Isolating valves and drains left closed
    • Pipes marked with circuit numbers and “flow” or “return”
    • Ensure that all Circoboard and plain insulation panels butt tightly together with no gaps.

Now follow the manifold commissioning and bleeding instructions


7
Filling the System
If your project uses more than one Circoflo underfloor heating system, lay all of the other systems and connect to the manifold(s) before moving on to filling the systems.

Now follow the commissioning and bleeding instructions on the manifold.

Make sure to fill out the commissioning information on the manifold booklet.